Celina, on the north edge of the Dallas-Fort Worth area, withholds final acceptance of public improvements until it has a maintenance bond for 100% of the improvement cost that runs two full years from acceptance, and the city's acceptance checklist asks for that bond from each contractor. If streets or utilities will be finished after the final plat records, the developer signs a development agreement and posts a performance bond for 110% of the cost to construct, complete and maintain them. On the many Celina subdivisions financed through a public improvement district, reimbursement depends on improvements built to city standards, so the bonds, the builders risk and the contractors' completed-operations coverage all decide when the developer gets paid back.

## Key Decision Points
- Celina's subdivision ordinance sets the maintenance bond at 100% of the contract price of all public improvements for two full years from final acceptance.
- The engineering final acceptance checklist asks for a maintenance bond from each contractor, plus an affidavit of all bills paid and a lien release.
- Improvements finished after the plat records need a development agreement and a 110% performance bond approved as to form by the City Attorney.
- Celina prefers public improvement districts for special financing, and PID money pays only for improvements built to the standards of the entity that will own them.
- An earthwork permit is required for any earth-disturbing activity, including stockpiling soil, so site work starts on a permit, not just a contract.

## A Maintenance Bond from Each Contractor Before Final Acceptance

Celina's subdivision ordinance, in Section 10.03.002(b), requires the subdivider to furnish a maintenance bond for 100% of the contract price of all public improvements, written by a corporate surety in favor of the city. The bond answers for repairs caused by defective workmanship or materials for two full years from final acceptance, and final acceptance is withheld until the City Attorney approves the bond. That is a higher penal sum than many North Texas cities ask for, and it sits on the books of whoever signs as principal for the full warranty period.

The city's Engineering Final Acceptance Checklist makes the mechanics specific. It lists a maintenance bond for each contractor, at 100% of the approved public infrastructure cost for two years from acceptance, as a contractor item. The same checklist asks the contractor for an affidavit that all subcontractors and suppliers have been paid plus a lien release. It also asks the owner for a true-up of the 3.5% inspection fee and any escrow or pro-rata payments. A paving contractor, a utility contractor and a grading contractor on the same subdivision may each owe a bond.

Two practical results follow. First, each contractor's surety will underwrite a two-year tail on top of the construction period, so the bond line needs room for it. Second, the developer's closeout schedule now depends on every contractor's surety issuing on time, which is why the bond forms and the subcontract language should be settled before the first pay application, not at the punch list.

Celina sits in the northern growth band of the region covered on the [Dallas-Fort Worth construction insurance and surety](https://mycontractorsinsurancequote.com/texas/metros/dallas-fort-worth).

## Recording the Plat Before the Work Is Done: The 110% Development Agreement Security

Celina's default is that public improvements are built and accepted before the final plat records. Section 10.03.044 lets a developer record first only through a development agreement, and when improvements are postponed the applicant must guarantee them with a bond from a surety licensed in Texas, on the city's form and approved as to form by the City Attorney. The security amount is 110% of the cost to construct, complete and maintain the improvements, based on the applicant's engineer's estimate and approved by the Director of Engineering.

The agreement carries obligations a surety will read closely. It gives the city authority to finish the work on default and recover its full legal costs, it must include a hold harmless and indemnity clause in the city's favor and it may be subordinated to the prime lender if the agreement provides for it. Where cash is posted, the city may reduce it to 10% after acceptance, and that remainder backs a two-year warranty that the improvements are free from defect. A letter of credit, allowed at the Director of Engineering's discretion, must be irrevocable and run at least two years.

For the developer, the choice between a bond, cash and a letter of credit is a balance-sheet decision as much as a legal one. A performance bond uses surety credit and usually requires the developer's corporate and often personal indemnity, while a letter of credit draws on bank lines that the construction lender may also be counting on.

The statewide framework behind these local requirements is explained under [Texas subdivision improvement bond rules](https://mycontractorsinsurancequote.com/construction-surety-bonds/subdivision-improvement-bonds/texas).

### Illustrative scenario: A PID-financed Celina Subdivision with Three Site Contractors

Redbud Prairie Partners is building a fictional 520-lot subdivision in Celina financed through a reimbursement PID. Grading, utilities and paving go to three separate contractors. Under the city's final acceptance checklist, each contractor must deliver a two-year maintenance bond for 100% of its approved public infrastructure cost, an affidavit of all bills paid and a lien release before the city issues its acceptance letter. The developer wants to record the final plat before the last collector segment is paved, so it signs a development agreement and posts a 110% performance bond on the city's form. The insurance review confirms each contractor's surety will issue the maintenance bond at closeout, adds the pond and collector work to builders risk and checks that the paving contractor's completed-operations coverage runs through the two-year period, since a failed section would delay the PID reimbursement request that depends on it.

## Public Improvement Districts and What Reimbursement Depends On

Celina's finance department lists more than 30 public improvement districts with annual service plan updates, including Mosaic, Legacy Hills, Wells North and Ten Mile Creek, plus the North Parkway Municipal Management District. The city's PID policy, adopted under Local Government Code chapter 372, says PIDs are the city's preferred special financing tool and that tax increment reinvestment zones should be discouraged. It describes two capital structures: a reimbursement PID, where the developer pays for infrastructure and is repaid from assessments over time, and a bonded PID, where the city issues special assessment revenue bonds.

Several policy terms touch the construction program directly. PID bond proceeds and assessment revenues may pay only for improvements designed and constructed to the standards of the governmental entity responsible for them. Developer reimbursement requests may be submitted no more often than monthly and are verified by the city's designee. A bonded PID needs a minimum value-to-lien ratio of 3:1 based on a third-party appraisal, and land in the ETJ qualifies only if the owners have petitioned for voluntary annexation.

That links the money to the quality of the work. A defect found at the final walk-through, a contractor whose maintenance bond is late or a damaged pond that has to be rebuilt can all push back the date a reimbursable cost is verified. Builders risk that includes the horizontal improvements, and contractors' completed-operations coverage that survives into the warranty period, protect the reimbursement as much as the asset.

How horizontal developers usually structure this program is covered under [insurance and bonds for land developers](https://mycontractorsinsurancequote.com/who-we-serve/developers-subdividers/land-developers).

## Earthwork, Floodplain and Right-of-Way Permits

Celina requires an Earthwork Permit under Section 3.12.006 of its ordinances for all earth-disturbing activity. The city's list includes clearing, grubbing and grading as well as excavation, embankments and the moving, depositing, stockpiling or storing of soil or rock. A site in a designated floodplain also needs a Floodplain Development Permit filed with the earthwork application. For insurance purposes, that means the start of risk is the permit date, and a stockpile placed before the permit is both a code problem and an uninsured-looking exposure if it washes onto a neighbor.

Work in the public right-of-way needs a separate Right-of-Way Permit filed through the city's online permitting system. The required uploads are the application, project plans, a certificate of insurance and a TxDOT authorization letter where a state road is involved. Utility contractors tying into existing mains, and paving contractors building turn lanes, should expect the city to look at the certificate before it issues the permit.

Because the certificate goes to the city, the additional insured wording and the named project on each contractor's policy matter. A certificate that lists the wrong project or omits the city where the permit or the development agreement requires it can hold a permit even when the coverage itself is in force.

Bond and insurance terms for permits in public right-of-way are explained under [Texas right-of-way and encroachment permit bonds](https://mycontractorsinsurancequote.com/construction-surety-bonds/encroachment-permit-bonds/texas).

## Pavement Design Life, Geotechnical Work and the Two-Year Tail

Celina's Engineering Design Standards set a pavement design life of 40 years and require a geotechnical investigation, with designs for pavement, subgrade and subsurface material, for all roadways, alleys and fire lanes. The standards publish minimum pavement and subgrade sections, require moisture conditioning tied to measured swell and state that a geotechnical evaluation may call for a heavier section but never a lighter one. The final acceptance checklist adds materials testing results and storm and wastewater line testing and video records as contractor submittals.

Those rules point to where Celina claims tend to arise. Paving failures on expansive clay and settlement over utility trenches are classic two-year warranty items, and in Celina the paving contractor's surety is on the hook for 100% of the approved cost while that tail runs. The contractor's general liability policy may respond to property damage that results from defective work, depending on the form, the endorsements and the facts, but it typically does not pay to fix the contractor's own faulty work.

A broker review here looks at whether each contractor's policy carries completed-operations coverage for the full warranty period, whether a residential or tract exclusion applies to subdivision work and whether the subcontract makes the paving or utility subcontractor indemnify the prime for warranty repairs the surety may otherwise pay.

The paving side of this exposure is covered in more depth under [paving contractor insurance and bonding](https://mycontractorsinsurancequote.com/who-we-serve/civil-underground-utilities/paving-contractors).

## Two Counties, One Program

Celina's ordinance refers to filing plats and development agreements in the Denton or Collin County records, depending on where the land lies, and the PID policy exempts property owned by Celina ISD, Prosper ISD, Denton County, Collin County and Collin College from assessment. A developer with phases on both sides of the county line may face different recording steps and, in the ETJ, county interlocal terms for the form of security.

The insurance program should follow the bonds rather than the county line. Each phase usually needs a clear answer to who is the principal on each maintenance bond, whether the developer or the contractor carries builders risk on the amenity center and pond work and how long completed-operations coverage must stay in force. On larger master-planned communities, a contractor-controlled or owner-controlled program may be worth comparing against separate contractor policies, and a broker review can lay the options next to the city's acceptance timeline.

How liability coverage behaves after the city accepts the work is explained under [completed-operations coverage after acceptance](https://mycontractorsinsurancequote.com/project-specific-liability-insurance/completed-operations).

## Before You Ask for a Quote

### What to Gather
- Celina development agreement draft and the engineer's cost estimate for any postponed improvements
- Each contractor's bid tabulation broken out by public improvement cost, which sets the 100% maintenance bond amount
- PID documents: the service and assessment plan, the construction, funding and acquisition agreement and the reimbursement agreement
- Earthwork, floodplain development and right-of-way permit applications with the certificates of insurance submitted to the city
- Geotechnical reports for roadways, alleys and fire lanes, plus the materials testing plan
- Current certificates and policy forms for every site contractor, including additional insured and completed-operations endorsements

### What to Ask the Insurer or Surety
- Will each contractor's surety commit now to a two-year maintenance bond at 100% of its approved public infrastructure cost?
- Who signs the development agreement indemnity, and does the surety require the developer's personal indemnity for the 110% bond?
- Does builders risk include the horizontal improvements and detention ponds that the PID will reimburse?
- Do the contractors' liability policies carry completed-operations coverage for the full two-year warranty period?
- Do any policies exclude residential tract or subdivision work in a way that affects the Celina project?
- What certificate wording will Celina accept for the right-of-way permit and the development agreement?

## Broker Notes

**Quick Answer:** Celina requires a maintenance bond for 100% of the public improvement cost for two years after final acceptance, asks for it from each contractor at closeout and requires a 110% performance bond when improvements are finished after the plat records.

**Common Mistake:** Leaving the maintenance bond to the end of the job. In Celina the city withholds final acceptance until each contractor's bond is approved, and on a PID project a late bond can push back the developer's reimbursement.

**Broker Perspective:** A broker watches the chain from contractor bond to city acceptance to PID reimbursement, and makes sure the subcontracts, the bond forms and the completed-operations terms all line up with Celina's two-year tail.

**Coverage Impact:** Celina's 100% maintenance bond often doubles the surety exposure a site contractor carries on a subdivision, and completed-operations coverage that lapses during the warranty period can leave a gap the bond alone may not address.

## Questions Buyers Ask

### Does Celina want one maintenance bond from the developer or one from each contractor?

The subdivision ordinance places the maintenance bond obligation on the subdivider at 100% of the contract price of all public improvements. The city's engineering final acceptance checklist lists a maintenance bond for each contractor as a contractor submittal. In practice, many Celina projects deliver one bond per contractor, so confirm with the city's engineering staff and settle the principal in each subcontract before work starts.

### Can we record our Celina final plat before the streets are finished?

Only through a development agreement. Celina's ordinance lets a final plat record before improvements are accepted if the developer signs a development agreement and posts security, typically a performance bond for 110% of the cost to construct, complete and maintain the postponed work. The bond must be on the city's form and approved by the City Attorney, and the agreement includes an indemnity in the city's favor.

### When do PID reimbursements start on a Celina subdivision?

It depends on the PID's financing and reimbursement agreements. Celina's policy says PID funds pay only for improvements built to the standards of the responsible governmental entity and that the developer may submit reimbursement requests no more than monthly, with the city's designee verifying each one. Defects, missing closeout documents or late maintenance bonds can delay that verification, so the insurance and bond plan affects cash flow.

### Do we need a Celina earthwork permit just to stockpile fill?

Celina's earthwork permit page lists moving, depositing, stockpiling and storing soil or rock among the earth-disturbing activities that need a permit under Section 3.12.006. A site in a designated floodplain also needs a floodplain development permit. Placing a stockpile early can create a code issue and a liability exposure for runoff onto neighboring land, so align the builders risk and liability start dates with the permit.

### Can land in Celina's ETJ be part of a PID?

Celina's PID policy allows a PID within the ETJ only if the property owners have successfully petitioned for voluntary annexation. A tract that stays outside the city may need a different financing path, and the security for its improvements may follow county interlocal terms. Ask counsel to confirm the annexation status before the bond and insurance program is priced.

## Official Sources

1. [City of Celina Subdivision Ordinance (November 10, 2020), Sec. 10.03.002(b) maintenance bond and Sec. 10.03.044 development agreements](https://www.celina-tx.gov/DocumentCenter/View/6200/SUBDIVISION-ORDINANCE), City of Celina. Maintenance bond of 100% of the contract price of all public improvements for two full years from final acceptance, acceptance withheld until approved by the City Attorney; development agreement with 110% performance bond from a Texas-licensed surety on the city's form, city authority to complete on default, hold harmless and indemnity clause, possible subordination to the prime lender, cash reduced to 10% for a two-year warranty, letter of credit irrevocable and at least two years; filing in Denton or Collin County records. Verified 2026-10-24.
2. [Engineering Final Acceptance Checklist](https://www.celina-tx.gov/DocumentCenter/View/12241/Engineering-Final-Acceptance-Checklist), City of Celina Engineering. Maintenance bond for each contractor at 100% of the approved public infrastructure cost for two years from acceptance; affidavit of all bills paid; lien release; 3.5% inspection fee true-up; materials testing and storm and wastewater line testing and video records; final walk-through and punch list. Verified 2026-10-24.
3. [City of Celina Public Improvement District (PID) Policy Overview](https://www.celina-tx.gov/DocumentCenter/View/10538/PID-Policy-Update), City of Celina. PIDs under Local Government Code chapter 372 as the preferred special financing tool and TIRZ discouraged; reimbursement and bonded PIDs; proceeds only for improvements built to the responsible entity's standards; reimbursement requests no more often than monthly; 3:1 minimum value-to-lien ratio for bonded PIDs; ETJ land only after a voluntary annexation petition; exemption of school district, county and college property. Verified 2026-10-24.
4. [Public Improvement Districts (list of Celina PIDs and annual service plan updates)](https://www.celina-tx.gov/1243/Public-Improvement-Districts), City of Celina Finance. More than 30 Celina PIDs with annual service plan updates, including Mosaic, Legacy Hills, Wells North and Ten Mile Creek, and the North Parkway Municipal Management District. Verified 2026-10-24.
5. [Permits and Right of Way Information](https://www.celina-tx.gov/1066/Permits-Right-of-Way-Information), City of Celina Engineering. Earthwork Permit under Section 3.12.006 for all earth-disturbing activities including clearing, grading, excavation and stockpiling; Floodplain Development Permit for sites in a designated floodplain; Right-of-Way Permit submittals including a certificate of insurance and a TxDOT authorization letter if applicable. Verified 2026-10-24.
6. [City of Celina Engineering Design Standards (version January 2024)](https://www.celina-tx.gov/DocumentCenter/View/11193/2023-Engineering-Design-Standards_Final), City of Celina Engineering. Pavement design life of 40 years; geotechnical investigation and pavement, subgrade and subsurface design required for all roadways, alleys and fire lanes; minimum pavement and subgrade sections with moisture conditioning tied to swell. Verified 2026-10-24.

## Related Decisions

- [Frisco subdivision bond and insurance rules](https://mycontractorsinsurancequote.com/texas/metros/dallas-fort-worth/frisco)
- [maintenance and warranty bonds](https://mycontractorsinsurancequote.com/construction-surety-bonds/maintenance-warranty-bonds)
- [builders risk for residential subdivisions](https://mycontractorsinsurancequote.com/builders-risk-insurance/residential-subdivisions)
- [subdivision site improvement projects](https://mycontractorsinsurancequote.com/projects/subdivision-site-improvements)
- [water and sewer contractor insurance](https://mycontractorsinsurancequote.com/who-we-serve/civil-underground-utilities/water-and-sewer-contractors)

---

Start a quote request: https://mycontractorsinsurancequote.com/get-a-quote · Call 844-978-7283

Contract and insurance reviews are a courtesy service that may be available at times, depending on our workload and on the size, timing and complexity of the project. A review is not guaranteed and is limited to insurance considerations. It is not legal advice and is not a substitute for advice from your own legal counsel, which you may need before signing a contract or obtaining coverage.

Insurance and surety services are provided through Gleason Insurance Brokers, LLC. Site information is educational and does not constitute legal advice, a binder, an offer of coverage, a guarantee of eligibility or confirmation of policy terms. Insurance conditions are governed by actual issued policies; surety rights and obligations are governed by bond and indemnity documents.