BNSF Railway Right-of-Entry and Contractor Insurance Requirements

The sample Contractor Right-of-Entry Agreement (Exhibit C-1) in BNSF's Public Projects Manual (2024) asks for general liability and railroad protective liability at $5,000,000 per occurrence and $10,000,000 aggregate, auto at $1,000,000 and employer's liability at $500,000, with additional insured, waiver and primary and noncontributory terms. The same manual's Chapter 10 summary lists lower limits for most public projects, and BNSF's pipeline and wire line application sets its own limits by crossing type, so the agreement or permit BNSF issues for the job is the document to follow.

Railroad track renewal beside a mainline, with new concrete ties and rail, a track machine, signal masts and an excavator in the right-of-way

Key Decision Points

  1. The sample Exhibit C-1 calls for CGL at $5,000,000 each occurrence and $10,000,000 aggregate on a post-2004 ISO occurrence form, with the 50-foot railroad exclusion removed from the insured contract definition.
  2. Railroad protective liability in the sample is written on ISO form CG 00 35 12 04 at $5,000,000 per occurrence and $10,000,000 aggregate, and BNSF's blanket railroad protective policy may be an alternative where available.
  3. The manual's Chapter 10 summary lists $2,000,000 and $6,000,000, or $5,000,000 and $10,000,000 for overpasses, underpasses and tunnels; confirm the agreement's limits with BNSF.
  4. BNSF's contractor orientation is renewed every year, and the manual says eRailSafe background qualification is good for two years.
  5. Pipeline and wire line applications carry a $2,000 non-refundable application fee, and the insurance limits differ between pipelines and electric or communication lines.

What BNSF Asks for Before a Contractor Enters

BNSF publishes its requirements for agency-sponsored work in the Public Projects Manual, which the railroad posts on its public projects page and labels 2024. Appendix A-1 of that manual is a template Exhibit C for contractor requirements. It says the contractor executes the Exhibit C-1 agreement, gives 30 calendar days' notice before any work on railway property and completes BNSF's Engineering Contractor Safety Orientation. Appendix A-2 is the sample Exhibit C-1 itself, the BNSF Contractor Right-of-Entry Agreement, and it carries the insurance terms discussed below.

Utility owners and their contractors follow a different track. Pipelines and wire lines that cross or run along BNSF property are licensed through a permit process BNSF runs with Jones Lang LaSalle Brokerage, Inc. (JLL), under its own application form and BNSF's Utility Accommodation Policy. Each document sets its own insurance terms, and both the manual and the application say BNSF can change them, so the exhibit attached to the agreement or license BNSF issues for a job is the one that governs.

Exhibit C-1: General Liability, Auto and Employer's Liability

In the sample Exhibit C-1, commercial general liability is set at $5,000,000 each occurrence with an aggregate limit of at least $10,000,000, written on a post-2004 ISO occurrence form. The policy is to be endorsed so that the definition of insured contract no longer carries the exclusion for work within 50 feet of railroad property. The sample also lists a waiver of subrogation, additional insured status for BNSF covering ongoing operations and completed operations, separation of insureds and primary and noncontributory wording.

Business auto is set at $1,000,000 combined single limit and must apply to any and all vehicles owned, used or hired, with additional insured, waiver of subrogation and primary and noncontributory endorsements. Employer's liability is $500,000 each accident, $500,000 disease policy limit and $500,000 disease each employee, with a waiver of subrogation.

Other terms in the sample apply across the program: certificates go to BNSF Railway Company in care of CertFocus, policies carry 30 days' notice of cancellation, carriers must be rated A- and Class VII or better, claims-made coverage is maintained for three years after the agreement ends and subcontractors carry the same coverage and name the Railway as additional insured. The sample also says the Railway may modify the requirements not more frequently than once every five years.

  • CGL: $5,000,000 each occurrence, $10,000,000 aggregate, post-2004 ISO occurrence form
  • CGL endorsements: insured contract amended, waiver, additional insured for ongoing and completed operations, separation of insureds, primary and noncontributory
  • Auto: $1,000,000 combined single limit, any and all vehicles owned, used or hired
  • Employer's liability: $500,000 each accident, disease policy limit and disease each employee

Railroad Protective Liability on CG 00 35

The sample Exhibit C-1 requires railroad protective liability at $5,000,000 per occurrence and $10,000,000 in the aggregate, written on ISO form CG 00 35 12 04. It lists a Pollution Exclusion Amendment and a Limited Seepage and Pollution Endorsement, says the policy may not exclude punitive damages and calls for the original policy to be provided to the Railway before work begins.

Instead of buying a separate policy, the sample says the contractor may participate, if available, in the Railway's Blanket Railroad Protective Liability Insurance Policy. The Exhibit C template in Appendix A-1 directs questions about procuring railroad protective liability to a named contact at Marsh USA. BNSF does not publish a price for the blanket program on its site, so the cost and availability for a given job are questions for Marsh, and a contractor can compare that answer with a stand-alone CG 00 35 policy quoted in the open market, subject to underwriting.

Two Sets of Limits in the Same Manual

The Public Projects Manual does not state one set of limits. The insurance summary in Chapter 10, on page 48 of the PDF, lists commercial general liability at $2,000,000 per occurrence and $6,000,000 aggregate, or $5,000,000 per occurrence and $10,000,000 aggregate for overpasses, underpasses or tunnels. It lists railroad protective liability at the same $2,000,000 and $6,000,000, with the same $5,000,000 and $10,000,000 for overpasses, underpasses or tunnels, business auto at $1,000,000 and employer's liability at $500,000, with workers' compensation at statutory limits. That summary says the railroad protective policy names only the Railway as the insured and that a licensee may participate, if available, in BNSF's blanket policy instead.

The sample Exhibit C-1 at pages 138 to 145 of the same PDF states $5,000,000 and $10,000,000 for both general liability and railroad protective liability, with no carve-out by structure type. We cite both passages as BNSF published them and do not try to reconcile them. Before quoting, ask BNSF which limits will appear in the agreement for the specific project, and size the general liability, any excess layers and the railroad protective policy to that document.

Orientation, eRailSafe and Flagging

Every worker on BNSF property needs the BNSF contractor orientation, found at bnsfcontractor.com. The manual says it must be completed annually at the contractor's cost and that training for another railroad cannot replace it. BNSF also requires eRailSafe background screening and a badge, and the manual states that this qualification is good for two years. The manual calls for an ANSI Class 2 orange vest rather than a yellow one. It places work within 25 feet of a track under Roadway Worker Protection rules.

A flagger is required for work within 25 feet of the track centerline, and beyond 25 feet where a crane could foul the track. The Exhibit C template asks for 30 calendar days' notice to the Roadmaster to arrange flagging and 5 working days' notice to cancel. BNSF's own planning estimates differ by passage: the Exhibit C template gives approximately $1,200 to $2,000 for an eight-hour basic day, and the flagging section of the manual body gives approximately $2,000 per basic eight-hour day, with overtime rates and a minimum bill of one eight-hour day. In the template the Agency pays for flagging, while an inspector coordinator at approximately $1,200 per day is borne by the contractor. The rate in effect when the work is performed governs, so budget from the agreement rather than the estimate.

Pipeline and Wire Line Permits: Insurance by Crossing Type

BNSF's Pipeline / Wire Line Process Instructions and Application (Rev. 10/20/2025), issued through JLL Permit Services, sets insurance by the type of facility. For a pipeline, overhead pipe truss or conveyor, it lists general liability with contractual liability at $5,000,000 per occurrence and $10,000,000 aggregate and railroad protective liability at $5,000,000 and $10,000,000. For an electric supply, communication or telephone line, it lists general liability at $2,000,000 and $4,000,000 and railroad protective liability at $2,000,000 and $6,000,000, except New Mexico at $5,000,000 and $10,000,000. Both columns list auto at $1,000,000 and employer's liability at $500,000 per limit. Pipeline work adds pollution legal liability, if necessary, at $5,000,000 per occurrence; the aggregate figure on the form contains a typo, so confirm it with JLL. The form states that the limits are subject to change without notice.

The form charges a $2,000 non-refundable application fee, which it says is not in lieu of a license fee or permit agreement fee, and each change to an application adds another $2,000. BNSF offers rush processing as its own option for an additional $7,000, not available for longitudinal installations. The form gives an average process of about eight weeks and asks for at least 10 business days' notice to the Scheduling Agent for flagging and observation. A broker has no role in permit timing and cannot speed BNSF's review.

Utility Accommodation Policy: Depths and Open Insurance Terms

BNSF's Utility Accommodation Policy (Engineering Services, January 2026) does not print fixed insurance limits. It says the utility may be required to obtain insurance coverage as determined by BNSF, requires the insurer to give BNSF 10 days' notice of cancellation or change and says subcontractors must carry a liability policy unless the Utility Owner's insurance extends to them. Applications and fees go through bnsf.railpermitting.com, the policy estimates processing at 30 to 60 days or longer and it states that verbal authorizations will not be granted.

The policy sets minimum depths that shape how a crossing is engineered and priced. A jack-and-bore crossing must sit at least 6 feet below the ditch flowline and 8 feet 3 inches below the base of rail. A horizontal directional drilling crossing must sit at least 6 feet below the ditch and 12 feet below the base of rail. Boring pits must be at least 30 feet from the track centerline, and overhead poles at least 50 feet from the centerline of the main track. A BNSF Construction Inspector is required on every utility installation at the Utility Owner's cost, flagging is also at the owner's cost and both need a written request at least two weeks ahead.

Because a frac-out or inadvertent return under a rail line can raise pollution questions that a general liability form may exclude, drillers often look at contractors pollution liability alongside the railroad terms, whether or not the permit names it.

Before You Ask for a Quote

What to Gather

  • The right-of-entry agreement or license BNSF issued, with its insurance exhibit
  • The project type, including whether it is an overpass, underpass or tunnel
  • For utility work, the facility type and whether it is a crossing or a longitudinal
  • Current certificates and endorsements for general liability, auto and employer's liability
  • Each worker's orientation completion date and eRailSafe status
  • The planned distance of work and equipment from the track centerline

What to Ask the Insurer or Surety

  • Which limits will BNSF place in this agreement: the Exhibit C-1 sample, the Chapter 10 summary or project-specific limits?
  • Is BNSF's blanket railroad protective policy available for this job, and what does Marsh quote for it?
  • Does our general liability remove the 50-foot railroad exclusion from the insured contract definition?
  • Do our auto and employer's liability policies carry the waiver and other endorsements the exhibit lists?
  • Is pollution legal liability necessary for this pipeline license, and at what aggregate?
  • Who pays for flagging and inspection under this agreement?
Quick Answer

BNSF's sample Exhibit C-1 calls for CGL and railroad protective liability at $5,000,000 per occurrence and $10,000,000 aggregate, auto at $1,000,000 and employer's liability at $500,000, while the same manual's Chapter 10 lists $2,000,000 and $6,000,000 for most projects; confirm the agreement's limits with BNSF.

Common Mistake

Assuming the contractor's standard general liability meets BNSF's terms. Many forms keep the 50-foot railroad exclusion in the insured contract definition, which the sample Exhibit C-1 asks to remove.

Broker Perspective

A broker matches each policy to the exhibit attached to the actual agreement or license, compares a stand-alone CG 00 35 quote with BNSF's blanket option where available and checks every listed endorsement before work begins.

Coverage Impact

Missing endorsements or limits sized to the wrong passage of the manual can delay entry or leave contractual obligations to the railroad without insurance behind them.

Questions Buyers Ask

What limits does BNSF require for railroad protective liability?

It depends on the document. The sample Exhibit C-1 in the 2024 Public Projects Manual says $5,000,000 per occurrence and $10,000,000 aggregate on CG 00 35 12 04. The manual's Chapter 10 summary says $2,000,000 and $6,000,000, or $5,000,000 and $10,000,000 for overpasses, underpasses and tunnels. Confirm the limits in your agreement with BNSF.

Can a contractor join BNSF's blanket railroad protective policy instead of buying one?

BNSF's documents say a contractor or licensee may participate in the Railway's blanket railroad protective policy if it is available. The manual directs procurement questions to Marsh USA, and BNSF does not publish a price on its site, so ask Marsh about availability and cost for the specific job.

How often do BNSF contractor workers need orientation and eRailSafe screening?

The Public Projects Manual says the contractor safety orientation must be completed annually at the contractor's cost, and the pipeline application says it must be done no more than one year before entry. The manual states that eRailSafe background qualification is good for two years.

Does a fiber crossing need the same insurance as a pipeline crossing on BNSF?

Not under BNSF's pipeline and wire line application revised 10/20/2025. Communication and electric lines list general liability at $2,000,000 and $4,000,000 and railroad protective at $2,000,000 and $6,000,000 outside New Mexico, while pipelines list $5,000,000 and $10,000,000 for both.

How deep must a directional drilling crossing be under BNSF track?

BNSF's Utility Accommodation Policy (January 2026) calls for horizontal directional drilling crossings at least 6 feet below the ditch and 12 feet below the base of rail, with boring pits at least 30 feet from the track centerline. Confirm the engineering requirements for each crossing with BNSF.

Official Sources

  1. BNSF Railway Public Projects Manual (2024), Chapter 10 insurance summary, Appendix A-1 Exhibit C and Appendix A-2 sample Contractor Right-of-Entry Agreement (Exhibit C-1), BNSF Railway. Chapter 10 limits (p.48); Exhibit C contractor requirements, Marsh contact, notice, orientation and flagging estimates (p.126); sample Exhibit C-1 insurance terms on CG 00 35 12 04 and blanket policy option (pp.138-145); eRailSafe two-year validity (p.46); annual orientation and vest rule (p.47); flagging section estimate (pp.49-50). PDF dated 2024-11-19. Verified 2026-10-26.
  2. BNSF Pipeline / Wire Line Process Instructions and Application (Rev. 10/20/2025), BNSF Railway / Jones Lang LaSalle Brokerage, Inc. (JLL) Permit Services. Insurance limits by facility type; pollution legal liability if necessary; $2,000 application fee and change fee; $7,000 rush option not available for longitudinals; eight-week average; 10 business days' notice; orientation within one year of entry. Verified 2026-10-26.
  3. BNSF Utility Accommodation Policy (Engineering Services, January 2026), BNSF Railway Engineering Services. Insurance as determined by BNSF with no fixed limits; 10 days' notice; subcontractor liability; online application; 30 to 60 days processing; no verbal authorizations; inspector and flagging at owner's cost; minimum depths for jack-and-bore and directional drilling crossings; pit and pole setbacks. Verified 2026-10-26.
  4. BNSF FAQs: Permits, BNSF Railway. BNSF's partnership with JLL for permits and the $2,000 processing fee for each application. Verified 2026-10-26.

Reviewed by the Principal, Gleason Insurance Brokers, LLCUpdated

Bring the Contract and the Exhibits.

Share the project, the contract insurance exhibit and any bond or lender requirements. A licensed broker may review them as a courtesy when available, before anything is quoted. See how a project review works or who runs this site.

Full disclaimer about contract and insurance reviews

Contract and insurance reviews are a courtesy service that may be available at times, depending on our workload and on the size, timing and complexity of the project. A review is not guaranteed and is limited to insurance considerations. It is not legal advice and is not a substitute for advice from your own legal counsel, which you may need before signing a contract or obtaining coverage.

Next Level Experience

Insurance done right.