What a Wrap-Up Is and What It Typically Wraps
A wrap-up, also called a consolidated insurance program, gathers the liability insurance for a project into one program instead of relying on each trade's annual policy. Texas Insurance Code §151.001 defines it as a program under which a principal provides general liability, workers' compensation or both for a single construction project or multiple projects. California's Insurance Code §11751.82 describes a wrap-up policy as one or more policies covering risks on a work of improvement and covering two or more of the contractors working on it.
In practice the core lines are commercial general liability and excess or umbrella liability written for the project site. Workers' compensation is often part of the program on larger jobs, though some sponsors leave it with each employer. Builders risk and contractors pollution liability are frequently bought alongside the wrap by the same sponsor, but they are separate policies with their own forms, insureds and deductibles, and whether they sit inside the program depends on how the sponsor structures it.
What the wrap typically does not include matters as much. Each contractor's commercial auto, contractor's equipment, professional liability and off-site operations usually stay with the contractor's own program. Surety bonds generally sit outside a wrap: a performance or payment bond protects the obligee, and the contractor still owes the surety indemnity whether or not the project is wrapped.
Gleason Insurance Brokers, LLC, which operates this site, also places owner- and contractor-controlled programs for California projects. Program placement and quotes are on Gleason Insurance Brokers' wrap-up program page.
Property damage to the work itself is handled separately; see how sponsors place builders risk for the course of construction.
Owner-Controlled vs. Contractor-Controlled Programs
The sponsor is the party that buys the policies and pays the premium. In an owner-controlled insurance program (OCIP) the owner or developer is the sponsor and usually enrolls the general contractor and the subcontractors. In a contractor-controlled program (CCIP) the general contractor sponsors the wrap, enrolls its subcontractors and builds the program cost into its own price to the owner.
The difference is who holds the risk inside the program. The sponsor chooses the carrier, sets the limits, accepts the deductible or self-insured retention and keeps whatever losses fall inside it. The sponsor also controls claims handling and the safety program. Enrolled parties gain coverage they did not have to buy, but they also lose some control over how claims arising from their work are defended and settled.
Texas law uses one word, principal, for whoever procures the policy, so disclosure duties follow the sponsor in either structure. California's wrap-up statutes likewise apply to an owner, builder or general contractor that obtains the program. Neither structure is better in the abstract; it turns on who has the balance sheet, the staff and the appetite to carry retained losses.
The decision factors, side by side, are laid out in our guide to choosing between an OCIP and a CCIP.
Program Administration: The Work Behind the Policy
A wrap-up is an administrative system as much as an insurance purchase. Someone has to issue the insurance manual, receive enrollment applications, verify that each subcontract carries the right insurance exhibit, collect monthly payroll reports, issue certificates, track enrolled and excluded parties and keep the loss reports. Larger programs often use a third-party administrator; smaller ones may run through the sponsor's broker or risk manager.
Payroll reporting is the hinge. Where workers' compensation is wrapped, premium is commonly calculated on enrolled payroll, and California's Insurance Code §11751.82 requires the wrap insurer to report workers' compensation losses and payroll for each contractor and subcontractor to its rating organization. On request the insurer must give each contractor its own report within 10 days. That record can feed each contractor's experience rating later, so accurate payroll by contractor is not a formality. Administration also controls what happens when the job ends. Enrolled parties need to know when coverage stops for ongoing work, how completed-operations coverage continues, who receives notice of claims years later and how the policy can be obtained once the administrator has closed the file.
The sponsor's side of this work, step by step, is set out in our page on what a sponsor takes on to run a wrap-up.
Enrollment and the Parties a Wrap Commonly Excludes
Enrollment is not automatic. A contractor typically becomes an insured only after it applies, the administrator accepts it and its scope is confirmed as eligible. A subcontractor that starts work before enrollment may be working without the wrap's protection, so the enrollment date and the first day on site should match.
Most programs exclude certain parties by design. Common exclusions include suppliers and vendors that only deliver materials, haulers and truckers, off-site fabrication shops, hazardous-material abatement trades, design professionals and some specialty trades the carrier does not want. Work performed off the defined project site, such as a precast yard or a fabrication shop across town, is usually outside the program even for enrolled firms. Excluded parties carry their own insurance to the contract's requirements, which means the sponsor still has to collect certificates and additional insured endorsements from them. A wrap reduces, but rarely eliminates, the traditional risk-transfer paperwork.
- Often excluded: suppliers, vendors and material-only deliveries
- Often excluded: haulers, truckers and anyone whose exposure is mainly auto
- Often excluded: off-site fabrication and storage locations
- Often excluded: abatement, design professionals and carrier-specific trades
Firms left out of the program still need their own coverage, and some sponsors pair the wrap with project-specific liability for the parties outside the wrap.
What a Wrap Asks of Every Enrolled Contractor
The first obligation shows up at bid time. Enrolled contractors are usually told to exclude the cost of the wrapped coverage from their price, a credit called a bid deduct or insurance credit. California requires the amount or method of calculating that credit to be disclosed in the bid or contract documents, and Texas requires the sponsor to give instructions on how to include or exclude program costs before the contract is signed.
During the job, contractors report payroll on the administrator's schedule, follow the sponsor's safety program, report incidents promptly and cooperate with claims. Many programs also require contractors to keep their own coverage for off-site work, autos and equipment, and some charge a share of the sponsor's deductible back to the trade whose work caused a loss. Contractors should read the insurance manual with the subcontract, not after. The manual often sets the audit process, the payroll definitions and the deductible chargeback method, and those terms can change what the job costs the contractor.
GCs weighing a wrap against their own program can start with our overview of insurance and surety for general contractors.
A Typical Wrap Timeline, from Feasibility to Closeout
A sponsor considering a wrap usually works backward from the bid date. Insurers generally want the project budget, schedule, site details and the sponsor's loss history well before the insurance manual can be written, and the bid documents need to tell trades how to price their own insurance. The phases below show a common order; the timing for any one project depends on its size, the market and the sponsor's own approvals.
Each phase can look different from one program to the next. Carriers apply their own guidelines and programs, terms depend on the specific project and the individual risk, and any wrap is subject to underwriting and to the terms, conditions and exclusions of the policies as issued.
- Feasibility: construction value, duration, number of trades and the sponsor's appetite for a retention, weighed against a project-specific or annual approach
- Marketing: a submission to insurers and, for owner programs, the choice of administrator, often months before bid documents issue
- Bid documents: the insurance manual, enrollment rules, excluded parties and instructions for removing wrapped coverage from bids
- Award and enrollment: each trade enrolls before it mobilizes, and certificates for coverage the wrap excludes are collected separately
- Construction: payroll reporting, safety inspections, claims handled inside the retention and enrollment of trades added later
- Closeout: the final audit, return or release of collateral and a completed-operations term that runs after the last trade leaves
How the wrap decision fits with a developer's other insurance and bond decisions, stage by stage, is covered in our article on developer insurance and bonds by project phase.
Timing and the Completed-Operations Extension
A wrap-up runs on the project schedule, not the calendar year. Ongoing-operations coverage typically runs from the start of construction to substantial completion or turnover, sometimes with extensions for delays. The sponsor should place the program before mobilization so contractors are enrolled before they start work, and the policy term should be long enough for realistic schedule slippage.
Completed-operations coverage continues after the work is finished, which is where construction-defect and injury claims tend to surface. Texas Insurance Code §151.051 requires a consolidated insurance program that includes general liability to provide completed-operations coverage for a policy period of not less than three years. Sponsors on longer-exposure work, especially residential or mixed-use, often seek longer extensions where carriers offer them. When the extension ends, the enrolled contractors' own annual policies may be asked to respond to later claims, so each contractor's broker should check how its own completed-operations coverage treats work once performed under a wrap.
For the mechanics of the post-completion tail, see how completed-operations coverage works after turnover.
Project Economics at a High Level
A wrap-up's cost case rests on buying one program at project scale instead of paying for many contractors' insurance through their bids. The sponsor pays the premium and administration, collects the bid deducts and keeps the retained losses. If claims stay low the sponsor may come out ahead; if losses fill the deductible, the program can cost more than the bids it replaced.
That is why sponsors look at the project's size, duration, payroll intensity and safety culture before committing. Programs tend to fit large, labor-heavy projects with a long schedule and a sponsor that can staff the administration. On smaller jobs the fixed administration cost and the retained-loss exposure can outweigh the savings, and a project-specific liability policy with strong subcontract risk transfer may be the more practical route. No price figures belong in a decision this early. The useful comparison is structural: what each option insures, who retains what and how much administration it takes to run.
For the threshold question of whether to wrap at all, see when a wrap beats a project-specific policy.
State Rules That Shape a Wrap in California and Texas
Texas Insurance Code chapter 151 sets disclosure deadlines for consolidated insurance programs, lets a contractor decline enrollment if the required information is not delivered on time and requires at least three years of completed-operations coverage. Its definition of construction project excludes a single-family house, townhouse, duplex or land development directly related to them, so residential wraps in Texas need a separate legal read.
California's wrap-up rules sit in the Civil Code's indemnity title. Sections 2782.95 and 2782.96 require disclosure of the premium credit and key policy terms, with one set of rules for private residential work and another for public works and other nonresidential projects. California Labor Code §3700 still requires every employer to secure workers' compensation, by insurance or approved self-insurance, so a contractor whose payroll is not wrapped keeps its own policy in force. Arizona projects are reviewed against the contract and the carrier's program terms; we cite no Arizona wrap-up statute here. In every state, the contract exhibits and policy wording control, and they should be reviewed by counsel and a broker before bids go out.
State-level licensing and bonding context is on our page about Texas project insurance and surety rules.
Before You Ask for a Quote
What to Gather
- Project description, site boundary and construction schedule
- Estimated hard cost and estimated payroll by trade
- Owner-contractor agreement insurance exhibit and any lender insurance requirements
- Expected list of trades and which ones may be excluded
- Sponsor loss history and safety program documents
- Builders risk and pollution plans, if they will be placed alongside the wrap
What to Ask the Insurer or Surety
- Which lines are included in the program and which stay with each contractor?
- What is the deductible or self-insured retention, and how can it be charged back to trades?
- How long does completed-operations coverage last after turnover?
- Who administers enrollment, payroll reporting and certificates, and at what cost?
- How does the program define the project site and off-site work?
- How are excess limits shared between ongoing and completed operations?
Quick Answer
A wrap-up is a single insurance program for one project, sponsored by the owner (OCIP) or the general contractor (CCIP), that insures enrolled contractors under shared liability and sometimes workers' compensation policies.
Common Mistake
Assuming every party on site is insured by the wrap. Suppliers, haulers, off-site shops and unenrolled subcontractors are often excluded, and a claim from one of them may fall back on the contract's risk-transfer terms.
Broker Perspective
We read the insurance manual, the deductible chargeback clause and the completed-operations term together, because those three documents decide what a wrap costs each party.
Coverage Impact
A wrap may replace an enrolled contractor's own project liability for on-site work, but off-site operations, autos and equipment typically stay on the contractor's own policies, depending on the form and endorsements.
Articles on This Topic
Questions Buyers Ask
Does a wrap-up replace my company's annual general liability policy?
Usually not. A wrap typically insures only your on-site work on that one project while you are enrolled. Your annual policy still responds to your other jobs, off-site work and anything the wrap excludes. Many annual policies carry an exclusion for work performed under a wrap, so ask your broker how your own policy treats wrapped projects and whether that exclusion could leave a gap after the wrap's completed-operations period ends.
Is workers' compensation part of every wrap-up program?
No. Some programs wrap only general liability and excess, and each employer keeps its own workers' compensation. Others wrap workers' compensation for on-site payroll as well. In California, Labor Code §3700 requires every employer to secure compensation, so a contractor whose payroll is not wrapped must keep its own policy or approved self-insurance in force for the work.
What happens if a subcontractor never enrolls in the wrap?
It works under its own insurance and must meet the subcontract's limits and endorsement requirements, just as on a non-wrapped job. The sponsor should collect its certificates and additional insured endorsements. In Texas, a subcontractor that was not given the required program information on time may decline to enroll, and the principal or contractor must then pay the actual cost of the substitute coverage.
How long does wrap-up coverage last after the building is finished?
Ongoing-operations coverage usually ends at substantial completion or turnover. Completed-operations coverage then continues for a stated period that varies by program. In Texas, a consolidated insurance program that includes general liability must provide completed-operations coverage for at least three years. Longer extensions may be available, and the length matters most on residential and mixed-use work where defect claims can surface late.
Can a wrap-up include builders risk and pollution coverage?
Sometimes, but they are usually separate policies placed by the same sponsor rather than part of the liability wrap itself. Builders risk insures the work under construction, and contractors pollution liability addresses pollution claims a general liability form may exclude. Ask for each specimen policy and confirm who is insured under each one before assuming enrolled contractors share them.
Official Sources
- Texas Insurance Code ch. 151 (Consolidated Insurance Programs), Texas Legislature. Definitions of consolidated insurance program, construction project (excluding single-family, townhouse, duplex) and principal (§151.001); pre-contract disclosure and opt-out (§§151.003-151.006); three-year completed-operations minimum (§151.051) Verified 2026-10-23.
- Cal. Insurance Code §11751.82 (wrap-up insurance policy reporting), California Legislative Information. Definition of a wrap-up policy covering two or more contractors on a work of improvement; insurer reporting of workers' compensation losses and payroll by contractor and 10-day copy on request Verified 2026-10-23.
- Cal. Civil Code §2782.96 (wrap-up disclosure, public works and nonresidential), California Legislative Information. Premium credit disclosure in bid documents and disclosure of limits, known exclusions and policy term for public works and nonresidential projects Verified 2026-10-23.
- Cal. Civil Code §2782.95 (wrap-up disclosure, private residential), California Legislative Information. Separate disclosure rules for private residential wrap-ups Verified 2026-10-23.
- Cal. Labor Code §3700 (securing workers' compensation), California Legislative Information. Every employer except the state must secure compensation by insurance or a certificate of consent to self-insure Verified 2026-10-23.