City of San Antonio Construction Contract Requirements: Bonds, Insurance and SBEDA

City of San Antonio solicitations released in 2025 call for a bid bond of at least 5 percent of the total bid, and the City's posted General Conditions, dated March 1, 2018, require 100 percent performance and payment bonds above $100,000 from a Treasury-listed surety with a Bexar County resident agent. The same 2018 document sets A.M. Best A- (VII) insurers, a $5,000,000 umbrella and additional insured status on CG 20 26 or broader, but the documents posted with each solicitation on CivCast, the City's bidding platform, control and can differ. After the City Manager's September 10, 2025, memo, a 2025 street solicitation set a 4 percent small business goal.

A project bonds form on a desk beside rolled drawings and a pen, carrying a gold surety seal, with a city skyline and a building under construction behind it

Key Decision Points

  1. 2025 solicitations call for a bid bond or proposal guaranty of at least 5 percent of the total bid from a corporate surety.
  2. 2018 General Conditions: 100 percent performance and payment bonds above $100,000 and a payment bond only above $50,000 up to $100,000.
  3. The surety must be admitted in Texas, on the Treasury list, with venue in Bexar County and a Bexar County resident agent.
  4. 2018 insurance table: A- (VII) insurers, $1,000,000 and $2,000,000 general liability, a $5,000,000 umbrella and CG 20 26 or broader.
  5. Retainage is 10 percent at $400,000 or less and 5 percent above, and the correction period runs one year from Substantial Completion.

Which San Antonio Documents Control a Bid

The City's Public Works department, formerly Transportation and Capital Improvements (TCI), bids capital construction work through CivCast. A December 2023 pavement preservation solicitation states, "Online bidding is utilized via CivCast," and lists the uploads a bid needs: the bid bond, the Subcontractor/Supplier Commitment Form, Texas Ethics Commission Form 1295 and the Local Preference and VOSB forms. The same solicitation names separate documents for the 081 General Conditions, the Insurance Requirements, the 075 Performance Bond and the 076 Payment Bond.

The newest General Conditions the City posts publicly is the TCI version dated March 1, 2018, a 127-page document. Solicitations from 2023 to 2025 attach a newer 081 General Conditions only on CivCast, and a June 2025 solicitation places the City's heat-illness ordinance in that document at Articles X.1.5 and X.2.3(a), so a version newer than 2018 is in use. The bond and insurance figures on this page come from the 2018 posted copy. Its successor was not available to the public outside CivCast and may set different figures, so the documents posted with each solicitation control, and the current requirement should be confirmed with the City before pricing a bid.

Bid Bonds, CVR Registration and Award Timing

Addendum 4 to the 2026 Street Rehabilitation Task Order Contract Package 1, dated September 26, 2025, asks for a "Bid Bond issued by a Corporate Surety Company in the amount not less than five percent (5%)" of the total bid, and a missing signature makes the bid non-responsive. RFCSP 2025-080 for the ACS Veterinary Hospital, a 2022 Bond project released June 4, 2025, sets the same 5 percent proposal guaranty from a surety licensed in Texas and asks for a letter of insurability and a current insurance certificate with the proposal.

The TCI Procurement/Contracting Policy and Procedures Manual of August 13, 2019, Section 2.7, requires a bid bond on contracts over $50,000 and not below that unless the solicitation asks for one. It sets no percentage and states that the City "will not accept a cashier's check or other security in lieu of a required Bid Bond." Under the 2018 General Conditions, the bonds, insurance and signed contract are due within 10 days of award, and if they are not delivered the City may keep the bid security. The street addendum adds that the contract and notice to proceed wait until the contractor is registered in the City's Centralized Vendor Registration, also called SAePS, the San Antonio electronic Procurement System.

Performance and Payment Bonds and the Surety

Article XI.3 of the 2018 General Conditions sets each bond at 100 percent of the Contract Sum under Texas Government Code Chapter 2253. Above $100,000, the text reads, "a Payment Bond and a Performance Bond equaling one hundred percent (100%) of the Contract Sum are mandatory." Above $50,000 up to $100,000, only the payment bond is mandatory. At $25,000 or less, the contractor may skip bonds and is then paid nothing until Final Completion. The 2019 procurement manual frames its table differently: at $50,000 or less, performance and bid bonds are not required unless requested and a payment bond only if the solicitation says so. The two documents are cited here with their dates, and the solicitation states which tier applies.

The performance bond under Article XI.3.1 also secures correction of defects for one year after final completion. Article XI.3.3 asks for a surety admitted and licensed in Texas, "listed in the most current United States Department of the Treasury List of Acceptable Sureties," with venue in Bexar County and a resident agent in Bexar County. A surety based elsewhere without a Bexar County agent would not meet that term as written, so firms new to San Antonio typically confirm the agent arrangement with their surety before bid day.

Insurance Limits and the Additional Insured Form

The insurance table in Article XI.1.3 of the 2018 General Conditions calls for insurers authorized in Texas "with an A.M Best's rating of no less than A- (VII)." The limits are statutory workers' compensation, employers' liability of $1,000,000 for each of its three limits, commercial general liability at $1,000,000 each occurrence with a $2,000,000 general aggregate (or the equivalent in umbrella or excess coverage) and business auto of $1,000,000 combined single limit for owned, non-owned and hired autos. Professional liability ($1,000,000 per claim, kept for two years) and builder's risk at 100 percent replacement cost apply where marked if applicable. Article XI.4 sets an umbrella of $5,000,000 per occurrence on a follow-form basis with no aggregate and drop-down terms.

Article XI.1.6 asks the contractor to name the City, its officers, officials, employees, volunteers and elected representatives as additional insureds by endorsement on every policy except workers' compensation and professional liability, with the other insurance clause not applying to the City, waivers of subrogation on workers' compensation, employers' liability, general liability and auto. The same article asks for advance notice of suspension or nonrenewal. Article XI.5.1.a names the City and the Design Consultant as additional insureds "using endorsement CG 20 26 or broader." Subcontractor general liability in Article XI.1.13.b carries a CG 25 03 per-project aggregate and completed operations for at least one year after acceptance. A new building takes builder's risk on a completed value form, and a renovation takes an installation floater with the City as joint named insured. These are the 2018 figures; each solicitation's Insurance Requirements document controls, and placement is subject to underwriting and the terms of the policies issued.

Retainage Tiers and the One-Year Correction Period

Article IX.6.2 of the 2018 General Conditions pays contracts of $400,000 or less at 90 percent and holds 10 percent until Final Completion. Where "the Contract amount exceeds four hundred thousand dollars ($400,000.00)," installments are paid at 95 percent and 5 percent is held. On a contract just above the line, the lower retainage can matter to the cash a firm needs to carry the job, and it is one of the figures a surety typically asks about when it looks at work on hand.

The correction period in Articles III.5 and XII.3.2 runs "One (1) year after the date of Substantial Completion of the Work," or from a later warranty commencement date the City sets. Because the performance bond reaches defects for a year after final completion, the bond and the correction period can end on different dates, and the surety's release of the bond follows the City's records rather than the contractor's own close-out date.

SBEDA After the September 10, 2025, Memo

The City runs its Small Business Economic Development Advocacy (SBEDA) program, and the 2019 manual says draft construction solicitations are checked for SBEDA before release and that "the City has established specific goals for local S/M/WBE participation." On September 10, 2025, a memo from the Office of the City Manager addressed how the SBEDA ordinance is applied, stating that contracts proceed "without applying race or gender conscious SBEDA ordinance-related Affirmative Procurement Initiatives."

Addendum 4 to the 2026 street rehabilitation solicitation, issued after that memo, changed its goal to a 4 percent SBE contracting goal only: the bidder must "subcontract or self-perform at least four percent (4%) of its prime contract value to SBEDA eligible, M/WBE certified firms." Goals are set per solicitation, so the commitment form in each bid package states the figure that applies to that contract.

SAWS Bids Under Its Own Rules

San Antonio Water System is a separate water utility with its own solicitations. Its 2026 Annual Asphalt Overlay work order contract package (CO-00898), with a pre-bid meeting on March 12, 2026, required that "Electronic bids shall be accompanied by a bid bond in an amount not less than five percent of the total bid price." The pre-bid presentation set an aspirational SBOP small business goal of 30 percent of the total bid price, not mandatory but with good-faith efforts required, and a self-performance minimum of 40 percent of the original contract price. SAWS places its insurance requirements in Section 5.7 of its General Conditions, and its insurance and bond terms sit in specification documents behind its vendor login, so they are not stated here.

The 2022 Bond Program and Planning Capacity

The City's 2022 Bond page describes "six propositions for the City's 2022 Bond Program totaling $1.2 billion and including 187 projects," approved by voters on May 7, 2022. The page reports that "As of June 2026, 72% of projects are complete or under construction," which leaves a share of the program still to reach construction. Encroachment and street work permits are a separate process from these contracts, explained in the Texas encroachment permit bond guide.

For a contractor chasing several of those lettings, the bonding question is aggregate as much as single job. A surety typically looks at the firm's financials, work on hand and the retainage it carries, and the answer can vary by carrier guidelines and programs. Lining up the bid bond, the Bexar County agent and the insurance certificate before the solicitation posts usually gives a firm the most room on bid day.

Before You Ask for a Quote

What to Gather

  • The solicitation's 081 General Conditions and Insurance Requirements from CivCast
  • A bid bond form for at least 5 percent of the total bid with the power of attorney
  • Surety confirmation of Texas admission, Treasury listing and a Bexar County resident agent
  • Certificates showing A- (VII) insurers, the umbrella and CG 20 26 or broader endorsements
  • The Subcontractor/Supplier Commitment Form against the solicitation's SBE goal
  • Centralized Vendor Registration (SAePS) status before award

What to Ask the Insurer or Surety

  • Does this solicitation's General Conditions change any 2018 insurance or bond figure?
  • Which bond tier applies to this contract amount under the solicitation?
  • Is our surety's agent in Bexar County, and is the surety on the current Treasury list?
  • Does the umbrella meet the follow-form, no-aggregate and drop-down terms?
  • Which certified firms count toward the 4 percent goal, and how is self-performance counted?
  • For SAWS work, what do the Section 5.7 insurance terms require once we have the documents?
Quick Answer

San Antonio's 2025 solicitations require a bid bond of at least 5 percent. The 2018 General Conditions set 100 percent performance and payment bonds above $100,000, a Treasury-listed surety with a Bexar County agent, A- (VII) insurers and a $5,000,000 umbrella.

Common Mistake

Pricing from the 2018 General Conditions without opening the solicitation's own 081 General Conditions and Insurance Requirements on CivCast, which postdate 2018 and control the contract.

Broker Perspective

The Bexar County resident agent and venue terms are easy to miss for out-of-area sureties, and they are worth settling before bid day rather than after award.

Coverage Impact

The 2018 terms ask for additional insured status on CG 20 26 or broader for the City and Design Consultant, waivers of subrogation and a drop-down umbrella, which not every policy form provides.

The Same Requirement in Other States

Questions Buyers Ask

What bid bond does the City of San Antonio require on construction bids?

The 2025 solicitations read call for a bid bond or proposal guaranty of not less than 5 percent of the total bid from a corporate surety. The 2019 procurement manual requires a bid bond on contracts over $50,000 and says the City will not accept a cashier's check in its place.

What surety does San Antonio accept on City construction bonds?

The 2018 General Conditions ask for a surety admitted and licensed in Texas, listed on the current U.S. Treasury List of Acceptable Sureties, with venue in Bexar County and a Bexar County resident agent. Confirm the terms in each solicitation.

What insurance limits are in the San Antonio General Conditions?

The posted General Conditions dated March 1, 2018, set general liability at $1,000,000 each occurrence with a $2,000,000 aggregate, $1,000,000 auto, $1,000,000 employers' liability and a $5,000,000 umbrella with A- (VII) insurers. Each solicitation's Insurance Requirements document controls.

How much retainage does San Antonio hold on construction contracts?

Under Article IX.6.2 of the 2018 General Conditions, the City holds 10 percent on contracts of $400,000 or less and 5 percent on contracts over $400,000 until Final Completion.

What small business goal applies to San Antonio construction bids now?

After the City Manager's September 10, 2025, memo, Addendum 4 to a 2025 street solicitation changed its goal to a 4 percent SBE contracting goal only. Goals are set per solicitation, so the bid package states the figure for each contract.

Does SAWS follow the City of San Antonio's contract terms?

No. SAWS bids its own work. A 2026 SAWS solicitation required a 5 percent bid bond, set an aspirational 30 percent small business goal and required 40 percent self-performance. Its insurance and bond terms sit in documents behind its vendor login.

Official Sources

  1. General Conditions for City of San Antonio Construction Contracts (TCI, March 1, 2018), City of San Antonio, Transportation and Capital Improvements (now Public Works). Bond tiers and 100 percent bonds under Chapter 2253; one-year defect coverage in the performance bond; surety admitted in Texas, Treasury-listed, Bexar County venue and resident agent; 10-day delivery and bid security; A- (VII) rating and insurance limits; $5,000,000 umbrella terms; additional insured, CG 20 26, waivers and notice; CG 25 03 for subcontractors; builder's risk and installation floater; retainage tiers; one-year correction period Verified 2026-10-26.
  2. TCI Procurement/Contracting Policy and Procedures Manual (August 13, 2019), City of San Antonio, Transportation and Capital Improvements. Section 2.7 bond threshold table; no cashier's check in lieu of a required bid bond; SBEDA check of draft solicitations and local S/M/WBE goals Verified 2026-10-26.
  3. Addendum 4, 2026 Street Rehabilitation Task Order Contract Package 1 (September 26, 2025), City of San Antonio, Public Works. 5 percent bid bond from a corporate surety; non-responsive if unsigned; 4 percent SBE contracting goal after the September 10, 2025, memo; Centralized Vendor Registration (SAePS) before contract and notice to proceed Verified 2026-10-26.
  4. RFCSP 2025-080, ACS Veterinary Hospital, 2022 Bond (June 4, 2025), City of San Antonio. 5 percent proposal guaranty from a surety licensed in Texas; letter of insurability and certificate with the proposal; heat-illness provisions at Articles X.1.5 and X.2.3(a) of a General Conditions newer than 2018 Verified 2026-10-26.
  5. IFB 2024 Pavement Preservation Package 12 (December 15, 2023), City of San Antonio, Public Works. CivCast-only bidding; required uploads; separate 081 General Conditions, Insurance Requirements, 075 Performance Bond and 076 Payment Bond documents Verified 2026-10-26.
  6. City Manager memo on SBEDA ordinance application (September 10, 2025), City of San Antonio, Office of the City Manager. SBEDA ordinance applied without race or gender conscious Affirmative Procurement Initiatives Verified 2026-10-26.
  7. 2022 Bond Program, City of San Antonio. Six propositions, $1.2 billion, 187 projects, approved May 7, 2022; 72 percent of projects complete or under construction as of June 2026 Verified 2026-10-26.
  8. SAWS 2026 Annual Asphalt Overlay WO Contract Package 1 (CO-00898) pre-bid presentation, San Antonio Water System. 5 percent bid bond; insurance in Section 5.7 of the SAWS General Conditions; aspirational 30 percent SBOP goal with good-faith efforts; 40 percent self-performance Verified 2026-10-26.

Reviewed by the Principal, Gleason Insurance Brokers, LLCUpdated

Bring the Contract and the Exhibits.

Share the project, the contract insurance exhibit and any bond or lender requirements. A licensed broker may review them as a courtesy when available, before anything is quoted. See how a project review works or who runs this site.

Full disclaimer about contract and insurance reviews

Contract and insurance reviews are a courtesy service that may be available at times, depending on our workload and on the size, timing and complexity of the project. A review is not guaranteed and is limited to insurance considerations. It is not legal advice and is not a substitute for advice from your own legal counsel, which you may need before signing a contract or obtaining coverage.

Next Level Experience

Insurance done right.