Texas highway contracts

TxDOT Contractor Requirements: Prequalification, Bonds and Insurance

TxDOT's 2024 Standard Specifications require a bidder to prequalify with a Confidential Questionnaire and an audited financial statement, and a bidder receives a proposal form only when the engineer's estimate fits within its available bidding capacity. Contracts over $100,000 carry performance and payment bonds in the full contract amount, and Item 3 sets $600,000 minimums for general liability and auto plus statutory workers' compensation with a waiver of subrogation. Each proposal can change these terms through special provisions, so the proposal for the letting controls.

A project bonds form on a desk beside rolled drawings and a pen, carrying a gold surety seal, with a city skyline and a building under construction behind it

Key Decision Points

  1. Item 2: a Confidential Questionnaire with an audited statement is approved for one year from the balance sheet date.
  2. TxDOT's November 12, 2024, notice raised the bidding capacity factor from 20 to 30 times net working capital.
  3. Item 3 Table 1: payment bond from $25,000, performance and payment bonds above $100,000, due within 15 days of award notice.
  4. Item 3 Table 2: $600,000 general liability per occurrence, $600,000 auto combined single limit and statutory workers' compensation.
  5. Item 8 requires the prime to self-perform at least 30 percent of the original contract cost; Item 9 holds no retainage on the prime.

Item 2: Prequalifying with the Confidential Questionnaire

TxDOT's 2024 Standard Specifications, Item 2, Article 2, require bidders to prequalify before a letting, citing 43 TAC §9.11 and §9.12. The route for most highway construction bidders is the Confidential Questionnaire. The instruction in Section 2.1 is direct: "Submit a CQ and an audited financial statement for approval." That approval is valid for one year from the balance sheet statement date, not from the date TxDOT approves it, so a firm with a calendar fiscal year and a slow audit can find much of its approval period gone before the paperwork clears.

The packet must reach TxDOT at least 10 calendar days before the letting. TxDOT's Contractor Prequalification page adds that the audited statement must come from an independent CPA firm, that internally generated financials will not be considered and that TxDOT allows a four-month grace period to prepare a new qualification statement. The Bidder's Questionnaire is the lighter alternative, but BQ bidders are eligible only for projects identified as waived and marked "W" on the letting schedule. A third form, the MQ, is for materials suppliers.

Bidding Capacity and TxDOT's November 2024 Notice

Item 1, Section 3.20, defines bidding capacity as the maximum dollar value a contractor may have under contract with the department at one time. Item 2, Article 3, uses it as a gate: a bidder gets a proposal form only if the engineer's estimate is within its available bidding capacity. On a joint venture, each participant must cover an equal share of the estimate from its own capacity, so a small partner can limit what the venture is able to bid.

The Prequalification page says capacity is net working capital multiplied by a TxDOT factor but does not state the factor. TxDOT's Notice to Contractors issued November 12, 2024, effective October 31, 2024, raised the factor from 20 to 30 and raised the minimum capacity for a CQ bidder with an audited statement from $1 million to $2 million, for a firm with at least two years' experience and four completed projects. The same notice raised the BQ minimum from $300,000 to $1 million and set a compiled-statement ladder for BQ bidders: $1.5 million after one year of experience, $2 million after two, then $500,000 more per year up to $6 million. The rule text behind these figures, 43 TAC §9.12, was confirmed only through that notice, so confirm the current factor and minimums with TxDOT before relying on them.

Item 3: Proposal Guaranty, Contract Bonds and the Surety

The 2024 specifications do not set a bid bond percentage. Item 2 says to provide a proposal guaranty in the amount indicated on the proposal form. A past TxDOT proposal, built on the 2014 specifications, set its bid bond at 2 percent of the engineer's estimate, rounded to the nearest thousand dollars and capped at $100,000; confirm the amount in the current proposal for each letting.

Contract bonds follow Item 3, Section 4.2, Table 1. Contracts under $25,000 need no bond, contracts from $25,000 to $100,000 need a payment bond only and contracts over $100,000 need both performance and payment bonds. The bonds are due within 15 days after written notice of award and are executed in the full amount of the contract. The surety must be authorized to do business in Texas, and if it becomes insolvent, loses its authority or its underwriting limitation drops below the contract amount, the contractor must furnish a substitute surety in the original full contract amount within 15 days of notification. Item 9 also pays an extra 1 percent of force-account compensation for the increase in bond on extra work.

Item 3 Table 2 and Form 1560: Insurance Minimums

Item 3, Section 4.3, Table 2, sets the insurance a contractor keeps in force until final acceptance. Commercial general liability is not less than $600,000 each occurrence, business auto is $600,000 combined single limit and workers' compensation is statutory, with a waiver of subrogation endorsement in favor of the department. Builder's risk at 100 percent of the contract price applies to building-facilities contracts only. The specification states that if coverage lapses for any reason, all work stops. Subcontractors must meet Table 2 through their own coverage or the contractor's.

Proof goes on TxDOT Form 1560, Certificate of Insurance (Rev. 07/24), or an Acord form, which the form names as the preferred certificates. The form preprints the same minimums, allows a split general liability limit of $500,000 bodily injury each occurrence with $100,000 property damage each occurrence and in the aggregate, and lists umbrella coverage only "if applicable" with no amount. Binder numbers are not accepted as policy numbers, previous editions may not be used and an updated form must reach TxDOT one business day before a policy expires. Group health does not substitute for workers' compensation. Form 1560 has no additional insured field, and Items 1-10 set no general additional insured requirement, so any additional insured terms come from the project's contract documents; the form itself does not require them. Completed operations and an umbrella minimum are also not stated in Items 1-10.

Railroad Insurance and Item 7 Indemnity

TxDOT does not publish one railroad limit in the general specifications. Item 3 says that for contracts with railroad requirements, the contractor looks to project-specific details for additional insurance, and Item 5, Article 8.2, points to the plan sheets for railroad insurance, flagging and right of entry agreements. A project that crosses or parallels a railroad can therefore carry railroad protective liability amounts and entry terms that appear nowhere else in the specifications, and they can vary from one proposal to the next.

Indemnity sits in Item 7, Article 15, Responsibility for Damage Claims. The contractor must indemnify and save harmless the State and its agents and employees from suits, actions or claims due to the contractor's negligence, and the same article addresses damage to pipelines and underground installations. Article 3 covers violations of law and Article 5 covers patent infringement. Whether a contractor's liability policy responds to a given indemnity claim depends on its contractual liability terms, the policy form and the facts, and it can vary by carrier guidelines and programs.

Self-Performance, Retainage and Subcontractor Payment

Item 8, Article 2, requires the engineer's written approval to sublet work and requires the prime to perform work with its own organization on at least 30 percent of the total original contract cost. The figure drops to 25 percent for a small business enterprise on a wholly state- or locally funded contract, specialty items are excluded from the count and subcontractors must be registered in E-Verify. For surety purposes, the self-performed share is the part of the job that rides on the prime's own crews and equipment, which is one reason underwriters typically ask how much of a TxDOT bid the firm intends to sublet.

Item 9, Articles 8 and 9, state that the department will not withhold retainage on the contractor. The prime pays each subcontractor within 10 days after TxDOT pays the prime and releases subcontractor retainage within 10 days after that subcontractor's work is satisfactorily complete, and these terms must be written into every subcontract and material purchase agreement at all tiers. Item 6, Article 3, also has the contractor transfer to TxDOT the warranties and guarantees required by the contract or received in normal trade practice. Encroachment permits for work in the state highway right of way are a separate process, explained in the Texas encroachment permit bond guide.

The 2027 UTP and Planning Surety Capacity

The Texas Transportation Commission approved the 2027 Unified Transportation Program at its August 2026 meeting, and TxDOT announced it on August 26, 2026, as a 10-year plan with a total projected investment of $138 billion, including $95 billion for projects across the state. For a contractor, the planning question is less the headline figure than how many of those lettings fit inside both the TxDOT bidding capacity and the aggregate program the surety is prepared to support.

Those two numbers are set separately. TxDOT's capacity comes from audited net working capital and its factor; the surety's program comes from its own underwriting of the firm's financials, work on hand, management and banking. A contractor can have TxDOT capacity that its surety does not match, or the reverse, so timing the annual audit, the CQ filing and the surety's renewal together typically gives the firm the clearest picture before it chooses which lettings to chase.

Before You Ask for a Quote

What to Gather

  • The current CQ with the audited financial statement and its balance sheet date
  • TxDOT's latest bidding capacity letter and any joint venture partner's capacity
  • The proposal for the letting, including its bid guaranty amount and special provisions
  • Plan sheets showing railroad insurance, flagging and right of entry terms
  • Current Form 1560 or Acord certificate with the workers' compensation waiver of subrogation
  • A schedule of self-performed versus sublet work against the 30 percent rule

What to Ask the Insurer or Surety

  • When does our CQ approval lapse, and will the next audit land before the four-month grace period ends?
  • Does the current factor and minimum in 43 TAC §9.12 still match the November 2024 notice?
  • Do the project's special provisions add an additional insured, completed operations or umbrella requirement?
  • What railroad protective limits do the plan sheets require, and who places that policy?
  • Will our surety support this contract on top of current work on hand?
  • Do our subcontract forms carry TxDOT's 10-day payment and retainage release terms to every tier?
Quick Answer

TxDOT's 2024 Standard Specifications require CQ prequalification with an audited statement, full-amount performance and payment bonds above $100,000, $600,000 general liability and auto minimums, statutory workers' compensation with a waiver of subrogation and 30 percent self-performance.

Common Mistake

Reading the CQ approval as a full year from approval. It runs one year from the balance sheet date, so a late audit shortens the window to bid.

Broker Perspective

TxDOT's bidding capacity and the surety's aggregate program are separate limits, and the lower one usually decides which lettings a contractor can pursue.

Coverage Impact

Form 1560 carries no additional insured field, and railroad limits come from plan sheets, so the certificate alone does not show every insurance term a project can impose.

The Same Requirement in Other States

Questions Buyers Ask

How long is a TxDOT Confidential Questionnaire approval good for?

Item 2 of the 2024 Standard Specifications says the approval is valid for one year from the balance sheet statement date. The packet must reach TxDOT at least 10 days before a letting, and TxDOT's prequalification page describes a four-month grace period to prepare a new statement.

Can a contractor without audited financials bid TxDOT construction work?

Only in a limited way. A Bidder's Questionnaire bidder is eligible only for projects marked "W" as waived. TxDOT's prequalification page limits a firm to $1 million unless it submits a compiled or reviewed statement, and the November 2024 notice set a capacity ladder for BQ bidders with compiled statements.

At what contract size does TxDOT require performance and payment bonds?

Item 3, Table 1, requires no bond under $25,000, a payment bond only from $25,000 to $100,000 and both performance and payment bonds over $100,000, each in the full contract amount and due within 15 days after written notice of award.

Does TxDOT require the department to be named as an additional insured?

Form 1560 (Rev. 07/24) has no additional insured field, and Items 1-10 set no general additional insured requirement. Any additional insured terms would come from the project's contract documents, so read the special provisions of each proposal and confirm with TxDOT.

What railroad protective liability limits does TxDOT set?

The general specifications set none. Item 3 sends contractors to project-specific details for railroad insurance, and Item 5 points to the plan sheets for railroad insurance, flagging and right of entry agreements. Limits can differ by project and railroad.

Does TxDOT hold retainage on the prime contractor?

No. Item 9 states that the department will not withhold retainage on the contractor. The prime must pay subcontractors within 10 days after TxDOT pays it, release subcontractor retainage within 10 days after satisfactory completion of their work and carry those terms into all subcontracts.

Official Sources

  1. TxDOT 2024 Standard Specifications, Items 1-10 (Items 1, 2, 3, 5, 6, 7, 8 and 9), Texas Department of Transportation. CQ and audited statement, one-year validity, BQ waived projects, 10-day filing; bidding capacity definition and joint venture rule; proposal guaranty on proposal form; Table 1 bond thresholds, full-amount bonds, 15-day timing and substitute surety; Table 2 insurance minimums, waiver of subrogation, lapse stops work; railroad insurance per project; Item 7 Article 15 indemnity; 30 percent self-performance; no retainage and 10-day subcontractor payment; warranty transfer; 1 percent bond on force account Verified 2026-10-26.
  2. TxDOT Form 1560, Certificate of Insurance (Rev. 07/24), Texas Department of Transportation, Contract Services. Preprinted $600,000 minimums, split-limit alternative, umbrella if applicable, waiver of subrogation, 1560 or Acord preferred, binder numbers not accepted, one-business-day renewal, no prior editions, no additional insured field Verified 2026-10-26.
  3. TxDOT Contractor Prequalification, Texas Department of Transportation. CQ, BQ and MQ; independent CPA audited statement; internal financials not considered; capacity from net working capital times a factor; $1 million limit without a compiled or reviewed statement; four-month grace period Verified 2026-10-26.
  4. TxDOT Notice to Contractors: Bidding Capacity Update (issued 11/12/2024), Texas Department of Transportation. Factor raised from 20 to 30 effective October 31, 2024; CQ minimum raised to $2 million; BQ minimum raised to $1 million; BQ compiled-statement ladder to $6 million Verified 2026-10-26.
  5. TxDOT proposal bid bond form (2014 specifications), Texas Department of Transportation. A past proposal set the bid bond at 2 percent of the engineer's estimate, rounded to the nearest thousand dollars and capped at $100,000 Verified 2026-10-26.
  6. TxDOT: New $138 billion investment planned for Texas transportation (August 26, 2026), Texas Department of Transportation. 2027 UTP: $138 billion over 10 years, including $95 billion for projects, approved by the Texas Transportation Commission in August 2026 Verified 2026-10-26.

Reviewed by the Principal, Gleason Insurance Brokers, LLCUpdated

Bring the Contract and the Exhibits.

Share the project, the contract insurance exhibit and any bond or lender requirements. A licensed broker may review them as a courtesy when available, before anything is quoted. See how a project review works or who runs this site.

Full disclaimer about contract and insurance reviews

Contract and insurance reviews are a courtesy service that may be available at times, depending on our workload and on the size, timing and complexity of the project. A review is not guaranteed and is limited to insurance considerations. It is not legal advice and is not a substitute for advice from your own legal counsel, which you may need before signing a contract or obtaining coverage.