Three Counties and Three Possible Owners
Katy's subdivision chapter applies to land inside the city and in its extraterritorial jurisdiction, and it refers to the master plans of Fort Bend, Harris and Waller counties. The city's Development page says all development within Katy is subject to its zoning ordinance and subdivision regulations and lists planned development districts such as Katy Boardwalk, Young Ranch and West Ten Business Park, each governed first by its own ordinance.
Around the city, the owner of a public improvement may be Katy, a municipal utility district or a county, and sometimes all three on one project. Streets may go to one entity while water, sewer and drainage go to a district. Each owner has its own acceptance process and its own bonding rules, so the first step on a Katy-area deal is a list of every improvement and who will accept it.
That list drives the insurance program as much as the bonds. Additional insured endorsements, waiver of subrogation and completed-operations terms in the contractor's policy should name each public owner the contracts require, and builders risk should follow each improvement until that owner accepts it.
The regional floodplain and detention rules that also apply here are covered on the Houston-area construction insurance and surety.
Katy's Guarantee of Performance Before Plat Recording
Section 10.06.004 of Katy's Code of Ordinances says no final plat will be recorded and no building, utility or other city permit, including a certificate of occupancy, will issue for property in a subdivision until the developer has completed the required public improvements and the city has accepted them for maintenance with the required maintenance bonds. The alternative is a guarantee of construction approved by the city attorney.
The ordinance prices the guarantee by form. Cash or a cashier's check is 100% of the installation cost with an agreement guaranteeing installation. A letter of credit is 100%, irrevocable and for a term covering completion, maintenance and warranty but not less than two years, payable on a sight draft and city certificate. A surety bond or subdivision performance bond is 125% of the installation cost, executed by a surety licensed in Texas and payable to the city. The guarantee lasts as long as the estimated construction time, and if the work is not finished when it expires, the city may require cash from the developer, owner or surety or an extension.
The 125% figure means a bond consumes more surety capacity than the same guarantee in cash or credit. A developer weighing the three should also note that the city sends notice of a withdrawn plat approval to any surety that posted a performance bond, which can bring the surety into the file early.
How plat security works across Texas cities and counties is explained under Texas subdivision improvement bond options.
When a Municipal Utility District Builds or Accepts the Work
Katy's ordinance gives a third path: an interlocal agreement with a governmental entity that will construct and maintain the improvements or accept their dedication, and that requires the entity to require performance, payment and maintenance bonds in the amount of the installation cost. Around Katy, that entity is often a municipal utility district. Under Water Code Section 54.016, land in a city's limits or ETJ cannot be included in a district without the city's written consent by resolution or ordinance, and the city may not require annexation as a condition of consent.
Once a district is contracting, Water Code chapter 49 applies. Section 49.273 requires advertised sealed bids for contracts over $150,000 and written bids from at least three bidders for contracts over $25,000 up to $150,000. Section 49.271 requires bid security of at least 2% of the bid on construction contracts over $50,000, and Section 49.275 requires the contractor to give performance and payment bonds under Government Code chapter 2253. TCEQ supervises districts and reviews the bond issues that finance their infrastructure, and its rule at 30 TAC Section 293.47 generally requires a developer contribution of not less than 30% of certain construction costs, subject to listed exemptions.
For a contractor, MUD work around Katy reads like public work even when a developer is advancing the money. The obligee is the district, the bonds follow chapter 2253 and the district's engineer inspects and reports on compliance. For the developer, reimbursement from district bonds depends on facilities that pass that review, so the contractor's bonds and insurance protect the developer's recovery too.
The statewide public work bond rules a district contract follows are explained under Texas chapter 2253 public work bonds.
ETJ Release Petitions and Shifting Rules
Since September 1, 2023, subchapter D of Local Government Code chapter 42 lets residents or the owners of a majority in value of an area petition a city to release land from its extraterritorial jurisdiction. Under Section 42.104, the signatures must be collected within 180 days, and the petition needs a map and a boundary description. Section 42.105 says that if the petition has the required signatures, the municipality shall immediately release the area. Section 42.101 lists areas the subchapter does not apply to.
For a Katy-area project, a release can change whose subdivision regulations and guarantee rules apply to future plats. County rules and any district's requirements would still govern. Contract exhibits, bond forms and insurance requirements that name the city or cite its code should be reviewed whenever an ETJ release is under way.
County platting and statewide developer rules are summarized under Texas developer bond and insurance rules.
Drainage Design: Harris County Flood Control and Houston Criteria
Katy's drainage section, 10.05.006, borrows from two neighbors. Open channels and detention ponds follow the Harris County Flood Control District's Policy, Criteria and Procedure Manual dated July 2019, while storm sewers, box culverts and runoff coefficients follow the current City of Houston Infrastructure Design Manual. Inside the Addicks Reservoir, Barker Reservoir and upper Cypress Creek watersheds, the district's March 2016 supplemental guidelines also apply, and the code addresses conflicts between those standards and another entity's criteria.
The code is specific about construction as well. Storm sewers are bedded in one and one-half sack per cubic yard cement-stabilized sand at least 12 inches thick, the 100-year hydraulic grade line may sit no higher than 12 inches above the top of curb or roadway center and unlined ditches have a 3-to-1 maximum side slope. Those details are the ones an inspector checks and a warranty claim later argues about.
For storm drain and site contractors, the insurance issues follow the drainage work: water damage to neighboring property during construction, silt discharge and settlement over storm lines after acceptance. Builders risk on detention ponds and outfalls, contractors pollution liability and completed-operations coverage that lasts through the maintenance bond period all deserve a look.
Coverage and bonding for drainage contractors is covered under storm drain contractor insurance.
Prevailing Wage, Closeout and the Program Design
Water Code Section 49.279 lets a district located in or within the ETJ of one or more cities adopt a city's or county's prevailing wage rate for its public works. A contractor bidding district work near Katy should confirm which rate the district adopted, because a payment bond claim or a wage dispute can follow a mistake. Section 49.277 requires the district engineer to report on contract compliance during the work and at completion.
On a mixed project, a contractor may hold a Katy-form surety bond on streets, a chapter 2253 bond to a district on utilities and county requirements on other pieces. Each has its own claim procedure and release date. A broker review can map those bonds against the contractor's completed-operations coverage and the developer's builders risk, so each improvement stays protected from groundbreaking to the end of its maintenance period.
How liability coverage applies after a public owner accepts work is explained under completed-operations coverage after acceptance.
Before You Ask for a Quote
What to Gather
- A list of every public improvement and the entity expected to accept it: Katy, a municipal utility district or a county
- The city's consent resolution or ordinance for the district and the district's development or reimbursement agreement
- District bid documents, including the bid security requirement and the chapter 2253 bond forms
- The engineer's installation cost estimate for any Katy guarantee of performance
- Drainage reports prepared to Harris County Flood Control District and City of Houston criteria
- Status of any ETJ release petition affecting the land
- Contractor certificates and policy forms naming each public owner the contracts require
What to Ask the Insurer or Surety
- Will the surety write a Katy subdivision performance bond at 125% of the installation cost on the city's terms?
- Can the contractor's surety support district bid bonds and chapter 2253 bonds at the same time as private work?
- Which prevailing wage rate has the district adopted for the contract?
- Does builders risk include detention ponds, outfalls and utilities until each public owner accepts them?
- Do the additional insured endorsements name the city, the district and the county where the contracts require?
- Does each contractor's completed-operations coverage last through the maintenance bond period of every owner?
Quick Answer
In Katy and its ETJ, plats and permits wait for accepted improvements with maintenance bonds or a guarantee such as a 125% surety bond, while municipal utility district work is publicly bid with chapter 2253 bonds to the district.
Common Mistake
Assuming one bond and one insurance certificate fit a Katy-area project. The city, a utility district and a county may each accept different improvements, with different bond forms, obligees and release dates.
Broker Perspective
A broker starts a Katy deal by mapping who will own each improvement, then matches each bond, additional insured endorsement and completed-operations term to that owner and its acceptance date.
Coverage Impact
A district contract, a city guarantee and county requirements can run on different timelines, and a policy that names only one owner or ends before the last maintenance period may leave part of the work outside the program, depending on the wording.
Other Houston Cities
Questions Buyers Ask
Who holds the payment and performance bonds when a MUD builds our Katy-area water and sewer?
The district does. Water Code Section 49.275 requires a contractor awarded a district construction contract to give performance and payment bonds under Government Code chapter 2253, and the district may set minimum criteria for the sureties. The developer may be advancing the money, but the obligee on those bonds is the district. Ask whether the developer agreement also requires the developer to be named elsewhere.
Can Katy hold our final plat until the streets are accepted?
Yes. Section 10.06.004 of Katy's code says no final plat will be recorded and no city permits will issue until the improvements are accepted for maintenance with the required maintenance bonds, unless the developer posts a guarantee. The options are 100% cash, a 100% irrevocable letter of credit of at least two years or a 125% surety bond, or an interlocal agreement with another public owner.
If our tract leaves Katy's ETJ, do the city's bond rules still apply?
Possibly not for future plats. Local Government Code chapter 42 lets owners of a majority in value petition for release, and the city must release the area once the required signatures are verified, unless an exception applies. County rules and any utility district's requirements would continue. Ask counsel how a release affects plats, guarantees and contracts already in place before changing the bond program.
Does a MUD construction contract near Katy need a bid bond?
For district construction contracts over $50,000, Water Code Section 49.271 requires each bidder to submit a cashier's or certified check or a bid bond of at least 2% of the bid. A bidder that is awarded the contract and then fails to sign it or furnish the required payment and performance bonds forfeits that deposit, so confirm surety support before bidding.
Why does Katy ask for 125% on a surety bond when cash is 100%?
Katy's ordinance sets those amounts by form: cash or a cashier's check at 100% of installation cost, a letter of credit at 100% and a surety bond or subdivision performance bond at 125%. The code does not state a reason. The choice affects surety capacity, bank lines and indemnity, so compare all three with your surety and lender before committing.
Official Sources
- Katy Code of Ordinances, Chapter 10 Subdivision Regulation, Sec. 10.05.006 (drainage) and Sec. 10.06.004 (guarantee of performance), City of Katy via Municode. Chapter applies in the city and its ETJ and references Fort Bend, Harris and Waller county master plans; no plat or permits until improvements accepted with maintenance bonds or a guarantee: 100% cash, 100% irrevocable letter of credit of at least two years, 125% surety bond from a Texas-licensed surety, or an interlocal agreement requiring performance, payment and maintenance bonds; notice of withdrawn plat approval to sureties; drainage criteria from HCFCD's July 2019 manual, the City of Houston Infrastructure Design Manual and March 2016 Addicks, Barker and Cypress Creek guidelines; storm sewer bedding and hydraulic grade line limits. Verified 2026-10-24.
- Development (City of Katy development ordinances and planned development districts), City of Katy. All development within the city is subject to the zoning ordinance and subdivision regulations; list of planned development districts, each governed first by its own ordinance. Verified 2026-10-24.
- Water Code ch. 49, Secs. 49.271, 49.273, 49.275, 49.277 and 49.279 (district construction contracts and bonds), Texas Legislature. Bid security of at least 2% for construction contracts over $50,000; advertised sealed bids over $150,000 and three written bids from $25,000 to $150,000; performance and payment bonds under Government Code chapter 2253; district engineer inspection and reports; prevailing wage rate adoption for districts in or near cities. Verified 2026-10-24.
- Water Code Sec. 54.016 (consent of city to municipal utility district), Texas Legislature. Land in a city's limits or ETJ may not be included in a district without the city's written consent by resolution or ordinance; a city may not require annexation as a condition of consent. Verified 2026-10-24.
- Local Government Code ch. 42, subchapter D, Secs. 42.101-42.105 (release from extraterritorial jurisdiction), Texas Legislature. Residents or owners of a majority in value may petition for release (added by S.B. 2038, effective September 1, 2023); signatures within 180 days with a map and boundary description; municipality shall immediately release the area when the petition has the required signatures; listed exceptions. Verified 2026-10-24.
- Water Districts, Texas Commission on Environmental Quality. TCEQ's general supervision and oversight of water districts, including review of bond issues that finance district infrastructure; district lookup tools. Verified 2026-10-24.
- 30 TAC Sec. 293.47 (developer contribution to district construction costs), Legal Information Institute (text of the Texas Administrative Code). Developer contribution of not less than 30% of certain district construction costs, subject to listed exemptions. Verified 2026-10-24.
Reviewed by the Principal, Gleason Insurance Brokers, LLCUpdated